Progress

February 14th, 2008

OK team,

Great job yesterday. Matt was able to wire up/program the circuit board, and the robot came to life, great job.

Austin was able to weld up the skids and the several pieces for the fork lift.

Jerrime helped Rick get the skids mounted to the tilt assembly and Victor was able to make the fork lift plates. Andrew and Ian ran the CNC lathe, and

Cassey finished up the spring steel for the capture pieces for the Catapult design.

We have tonight to mount up the tilt motor and get the skid cross beams weld up. Along with mounting the fork lift plates on.

Our goal is to have a running robot that can at least pick up the ball to demonstrate at the Open House.